Drinking Water Branch

 

Return Links

 
 Water System Detail

 
 Water Systems

 
 Water System Search

   County Map

Glossary

 

Sample and Compliance Schedules

Water System No. : MT0000199 Federal Type : C
Water System Name : DENTON TOWN OF State Type : C
Principal County Served : FERGUS Primary Source : SW
Status : A Activity Date : 06-22-2011

TCR Schedules

Sample Count Sample Type Sample Frequency Effective Begin Date Effective End Date Seasonal Start MM/DD Seasonal End MM/DD Analyte Code Analyte Name
1 RT MN 12-01-2007 1/1 12/31 3100 COLIFORM (TCR)
Total Number of Schedules Displayed = 1

Frequent Field Sample Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Days to Monitor per month Samples Required per day Effective Begin Date Effective End Date Summary Type
TP001 TP FOR WL003 AND SPRINGS 0100 TURBIDITY 31 1 10-01-2021 MAXT
TP001 TP FOR WL003 AND SPRINGS 0100 TURBIDITY 31 1 10-01-2021 95PT
TP001 TP FOR WL003 AND SPRINGS 0999 CHLORINE 31 1 12-01-2019 EPRD
TP001 TP FOR WL003 AND SPRINGS 0999 CHLORINE 31 1 01-01-2015 EPRD
DS001 DISTRIBUTION SYSTEM 0999 CHLORINE 31 1 04-01-2013 DSRD
Total Number of Schedules Displayed = 5

Non-TCR Group Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Group Code Analyte Group Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
DS001 DISTRIBUTION SYSTEM ASBE CDS ASBESTOS 1 RT 9Y No Monitoring in Current Period 01-01-2029 to 12-31-2037
DS001 DISTRIBUTION SYSTEM DBP2 CDS DBP ST 2 1 RT YR 08-01-2024 to 08-31-2024 08-01-2025 to 08-31-2025
DS001 DISTRIBUTION SYSTEM PBCU CDS LEAD COPPER ONLY 5 RT 3Y 06-01-2023 to 09-30-2025 06-01-2026 to 09-30-2028
TP001 TP FOR WL003 AND SPRINGS ARSE CDS ARSENIC 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TP FOR WL003 AND SPRINGS NITR CDS NITRATE NITRITE 1 RT QT Monitoring Completed 07-01-2024 to 09-30-2024
TP001 TP FOR WL003 AND SPRINGS INO1 CDS P2-5 INORGANICS 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP001 TP FOR WL003 AND SPRINGS GRAL CDS RAD GROSS ALPHA 1 RT 6Y 01-01-2023 to 12-31-2028 01-01-2029 to 12-31-2034
TP001 TP FOR WL003 AND SPRINGS COMB CDS RADIUMS COMBINED 1 RT 9Y 01-01-2017 to 12-31-2025 01-01-2026 to 12-31-2034
TP001 TP FOR WL003 AND SPRINGS SOC CDS SOC REGULATED 1 RT 3Y 01-01-2023 to 12-31-2025 01-01-2026 to 12-31-2028
TP001 TP FOR WL003 AND SPRINGS VOC1 CDS VOC 1 RT YR 01-01-2024 to 12-31-2024 01-01-2025 to 12-31-2025
TP001 TP FOR WL003 AND SPRINGS SWW STATE WIDE WAIVERS 1 RT 9Y Monitoring Completed 01-01-2029 to 12-31-2037
Total Number of Schedules Displayed = 11

Non-TCR Individual Schedules

Water System Facility State Asgn ID Water System Facility Name Analyte Code Analyte Name Sample Count Sample Type Sample Frequency Current Monitoring Period Date Range Next Monitoring Period Date Range
CH002 COMMON HEADER FOR SPRINGS 3013 FECAL COLIFORM 1 RT WK ----- -----
SP003 SPRING COLLECTOR 1 1032 MANGANESE 1 RT YR 01-01-2024 to 12-31-2024 ----
SP004 SPRING COLLECTOR 2 1032 MANGANESE 1 RT YR 01-01-2024 to 12-31-2024 ----
SP005 SPRING COLLECTOR 3 1032 MANGANESE 1 RT YR 01-01-2024 to 12-31-2024 ----
SP006 SPRING COLLECTOR 4 1032 MANGANESE 1 RT YR 01-01-2024 to 12-31-2024 ----
WL003 WELL 1 GWIC 30664 1032 MANGANESE 1 RT YR 01-01-2024 to 12-31-2024 ----
Total Number of Schedules Displayed = 6

Compliance Schedule

Activity Name Activity Due Date Activity Projected Date Activity Achieved Date Activity Reported Date
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 1) 2020-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 2) 2021-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 3) 2022-12-31
SUBMIT ACCEPTABLE CCR 2024-06-30
SUBMIT ACCEPTABLE CERTIFICATION 2024-09-30
LSLI COMPLETE INITIAL LSL INVENTORY 2024-10-16 10-16-2024
LSLI SUBMIT LEAD SERVICE LINE INVENTORY 2024-10-16 10-16-2024
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 5) 2024-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 6) 2025-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 7) 2026-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 8) 2027-12-31
WAIVER (STEP 5) : PUBLIC NOTICE (YEAR 9) 2028-12-31
WAIVER (STEP 3) : SWP RECCOMENDATION
Total Number of Compliance Schedules Displayed = 13

Disclaimer
If the Current Monitoring Period Date Range reads “Monitoring Completed”, sufficient samples have been collected from the specified water system facility (WSF). If the Current Monitoring Period Date Range reads “Monitoring Partially Completed”, sufficient samples have been collected for some but not all the analytes in the group. A monitoring violation may occur if samples were not collected from the appropriate sampling point, were not analyzed by a certified laboratory, or were not reported on time. Total Coliform Rule (TCR), triggered, confirmation or repeat schedules or schedules with a daily or weekly frequency will not display this message.


The Current Date and Time is: Mon May 06 03:49:09 MDT 2024