State Asgn ID No. |
Facility Name |
Type |
Activity Status |
DS001 |
DISTRIBUTION SYSTEM |
DS |
A |
IN002 |
INTAKE FT PECK RESERVOIR |
IN |
A |
PC001 |
PRESSURE CONTROL TANK 1 FINISHED WATER |
PC |
A |
PC002 |
PRESSURE CONTROL TANK 2 FINISHED WATER |
PC |
A |
PF001 |
PUMP FACILITY INTAKE RAW WATER |
PF |
A |
PF002 |
PUMP FACILITY RAW WATER TO TP002 |
PF |
A |
PF003 |
PUMP FACILITY TREATED RAW WATER |
PF |
A |
PF004 |
PUMP FACILITY FINISHED WATER |
PF |
A |
ST001 |
STORAGE TANK 3000 GAL FINISHED WATER |
ST |
A |
ST002 |
STORAGE TANK 1200 GAL RAW WATER |
ST |
A |
ST003 |
STORAGE TANK 3000 GAL FINISHED WATER |
ST |
A |
ST004 |
SEDIMENTATION TANK 3000 GAL RAW WATER |
ST |
A |
TP002 |
TP FOR FT PECK RESERVOIR |
TP |
A |
WL002 |
WELL 1 INACTIVE |
WL |
I |